| Description |
| Eagle Magic Patch is a one component polymer modified rapid-set cementitious mortar that allows quick repairs at a variety of water ratio and at many thicknesses over old concrete imperfections. It can be applied very fluid with a broom-brush or more consistent for applications that can vary from 6 mm (1/4") to 75 mm (3") in one application. This mortar is specially formulated to recondition horizontal or sloped concrete jobs, inside or outside. Being concrete grey, this high performance polyvalent product can repair and/or give concrete surfaces a uniform and better than new look. Eagle Magic Patch can also be colored with ferrous oxide pigments. |
| Surface Preparation |
All surfaces to be covered shall be structurally sound, clean and free from traces of dust, oil, grease, wax, paint, curing agent, coatings and loose particles. They must also be exempt from any trace or presence of acids, concentrated alkalis, chemical cleaning agent or any other material that can reduce adhesion. All concrete substrates shall be completely cured and at least 28 days old. They must be roughened for a good adhesion. Saturate concrete surface with clean water within few hours before repairs leaving no excess water and apply mortar when surface is dry again. Use of Eagle Prime Plus as primer is a good alternative to concrete water saturation. Ambient, surface and product temperature must be superior than 10ºC (50ºF) and lower than 35ºC (95ºF) before installation and for the first 24 hours. Protect from rain or liquids for 24 hours. Avoid working under intense sun. |
| Mixing |
In a clean container, upon desired consistency, pour from 200 to 250 ml of fresh clean water per kilogram of product. Add gradually Eagle Magic Patch powder while mixing with a low-speed drill and a mixer. Blend for 2 to 3 minutes scraping recipient walls and paddle to obtain a homogeneous trowelable lump-free consistency. Proceed for application and finishing. Clean working tools and hands with water while product is still fresh. |
| Curing |
Eagle Magic Patch takes 20 to 30 minutes to dry. Curing time may vary according to temperature and humidity level. Protect surface from rain, sun and wind. Protecting job against weather, with a plastic sheeting in example, must be done without any contact with the surface as it could alter the finish. Wait from 2 to 3 hours prior to allow light traffic. |
| Package |
| This product is available in 5 kg bag and 11.34 kg bag. |
Storage |
| Store in a dry and fresh area. Shelf life is 12 months in its original non-opened container. |